Snowy Mtns Authority
The Snowy Mountains Authority needed to waterproof Murray 1 and 2 Power Stations. The building hold sensitive electrical generators. The waterproofing had to withstand the Snowy Mountains environment. Andersal’s design was selected.

Garden Island Sydney
The Department of Defence wanted long lasting repair to Garden Island Dry Dock. They selected Andersal. (The concrete and reinforcement is subject to one of the most hostile environments for concrete-cyclical soaking in salt water followed by drying out and cracking in the hot sun).

Glebe Island Silos
                                 When Cement Australia needed to gain extra capacity utilisation at the Glebe Island Silos they selected Andersal to strengthen the existing columns with carbon fibre and to thicken and strengthen the concrete base.

ANSTO, Lucas Heights
When ANSTO (Australian Nuclear Science & Technology Organisation) at Lucas Heights wanted to waterproof a building at the nuclear reactor complex they selected Andersal.

BlueScope Rail Bridge
When BlueScope Steel needed to repair a mission critical high capacity railway bridge at Port Kembla and could only allow a short time for the bridge to be out of operation they adopted Andersal’s recommended water blasting solution and engaged Andersal for the project.


 Goulburn Street Car Park

The Council of the City of Sydney decided to completely replace the Southern cavity brick wall of Goulburn Street Car Park (5 storeys high and twice as wide) with a large tri-sign. Andersal was contracted to demolish the brick wall, install a huge steel frame and install the tri-sign.