Snowy Hydro Power Station
Andersal was engaged to waterproof the Snowy Hydro Murray Power Stations 1 and 2.
Andersal was engaged to waterproof the Snowy Hydro Murray Power Stations 1 and 2.
The task was to demolish the cavity brick southern wall (5 storeys high and about twice as wide at 37.5m) and erect a steelwork frame to install the largest tri-sign in the Southern Hemisphere.
Andersal was engaged to assist develop a technical specification to restore two large metal roof structures showing some advanced stages of corrosion on a 44-storey high rise building at Aurora Place.