Snowy Hydro Power Station
Andersal was engaged to waterproof the Snowy Hydro Murray Power Stations 1 and 2.
Andersal was engaged to waterproof the Snowy Hydro Murray Power Stations 1 and 2.
The purpose of this project was to upgrade the deteriorating roof sheeting and facade cladding of the apartment building. The scope of works included repair of metal, concrete, masonry, waterproofing and stormwater systems.
This 89 unit building located next to Elizabeth Bay wharf is exposed to aggressive environmental conditions. Accordingly, the repair specification was extensive with an emphasis on material and workmanship warranty periods.
The northern end of world-famous Bondi Beach is a tidal pool popular with generations of locals and tourists.
Andersal was engaged in remediation works to rectify extensive concrete spalling to the three Department of House buildings at Maloney Street, Rosebery; Northcott Building, Surry Hills; O’Dea Building, Camperdown.
Long lasting repairs were required to the reinforced concrete walkways built into the sides of the inner and outer caisson of the Dry Dock at Garden Island.
This large condominium of 25 high quality units required a complete external make-over including:
Harbourviews is a residential building consisting of 90 units, 9 levels of residency and 2 car park floors. The car park slab was showing signs of fatigue and test samples confirmed.
A major project for Cement Australia was untaken to strengthen 12 silos, enabling them to be filled to capacity. The existing silos were designed for grain and only strong enough to be half filled with cement product.